Revit Progress 1 + 2Revit Progress 4 |
Revit Progress 3Today on the 11th April I have completed my stairs (Not elevators) and the roof! I have achieved this by making the roof myself which actually hangs over the building creating more effect on the facade. I have also allowed the 'sun path' option which will soon (when I enter the coordinates for my building) will predict the suns path which will then allow me to get solar panels fixed on the building to make it more sustainable.
|
19/04/2016 I have added colour to my building which is carried over from other buildings in my sector giving the area a added effect for beauty. I have also decided to add a second floor allowing me to add more designs and rooms in my building making it more useful as a whole, on the next revit progress I will be looking to complete the outer walls for the building and add some furniture to some of the rooms. I will also be colour coding my rooms in order to identify which is which along with the key which will be added to the right hand side.
|
Revit Progress 5 |
19/04/2016 I have added furniture to the building, for only two rooms; the cafe and the reception, I have yet to finish them. I have also added glass doors courtesy of revit city for added effect to the modern society, it also allows users to walk past rooms and look through the doors to see the fantastic features. A elevator has also been added which will be included in the next revit progress, this allows for disability use to the upper floors making my building accessible!
|
Revit Progress 604/05/2016 I have been expanding the building since I realised the measurements are incorrect so I have been adjusting the size, I have also added more furniture to the building allowing for more view of the finalised project, I will be moving the furniture around as I progress, windows have also been added and a ceiling plan is in place which will allow me to add lighting to the rooms, the ceilings will not apply to the sports rooms since they need large amounts of space. I will also be adding multiple elevators to the building.
|
Revit Progress 715/05/2016 I have been working more on the interior of the building which is the sports area and the gym, I have also been making my last adjustments to the expansion which will now bet settled. My walkway is also completed on the reception and a column has been added there to support it. Some more furniture has been added to the ground floor, the furniture in the reception is now complete I will begin on the other areas in the following weeks.
|
Revit Progress 8
01/06/2016 This week I have added the indoor football pitch and the basketball court and have made some adjustments to the building itself, I have increased the building slightly and hopefully it will keep inside the build able zone. Some more furniture has also been added to give me a visual view on where it should be placed within the building facility. I have also completed a diagram of where all my electrical, water and heat will go in my building, you will find this to the right.
|
Revit Progress 908/06/2016 This week I have added more furniture to the building along with more glasssf
|